Tower Inspection. The Middleton Water Utility will be taking the water tower on High Rd. out of service for approximately 1-2 weeks to perform a follow up coating inspection. The work will be between 7/23 and 8/3 and it is possible that some residents may notice a slight decrease in water pressure during this work, or discoloration of the water. Please be assured that the City’s water system has sufficient capacity to maintain adequate pressure for both domestic and fire protection requirements. Thank you for your cooperation during this work.